Blog Post

News from us
29 January 2020

GenCos fail to generate 3,205.5 megawatts due to gas shortage

Electricity Generation Companies, GENCOS, comprising gas-fired and hydro stations said that they could not generate three thousand, two hundred and five-point five megawatts of electricity on Monday due to unavailability of gas.

This was contained in a daily energy report by the Advisory Power Team, office of the Vice President in Abuja on Tuesday.

The report also noted that two hundred point one megawatts of electricity were not generated due to the unavailability of transmission infrastructure during the period.

|

Leave a Reply